Features: Flexible Scheduling
Standard unplanned service comes with 5x8 scheduling to meet customer schedule and business requirements. Scheduling outside normal business hours will be quoted seperately.
Certified Representatives
CyberPower Systems service personel have the training and skill to inspect, verify setup, power on, and verify a UPS is operating as designed.
System Repair
A technician will diagnose and make necessary repairs.
System Shut Down/Start Up
A technican will assist with shutting the UPS off and bring it back on to allow for facility maintenance or upgrades.
Labor and Travel Expense Included
The unplanned service visit includes 2 hours of labor and travel expenses to reduce budgeting surprises. Unplanned service visits that occur after hours or that require more than 2 hours will b...
Features: Flexible Scheduling
5x8 Startup supports a customer's schedule and business requirements
Certified Representatives
A CyberPower Systems service representative with the training and experience will come to you location to inspect the installion, verify setup, power on, and verify a UPS is operating as designed.
System and Site Review
A technician will inspect the system for handling damage, proper installation, ensure the site meets operational and environmental requirements, and is accessible for future maintenance and service requirements.
Installation Safety Check
An inspection will be done to confirm the circuit breakers are properly sized, and verify wiring to and from breakers is correct. The incoming voltages will be measured to ensure they match system specifications and phasing, and phase...