Features: Enhanced local and remote management capabilities enable users to understand the condition of the critical infrastructure space and take action when necessary
High power factor operation up to unity provides the highest available power (watt) for use by connected IT equipment, allowing for more connected devices
Integrated serial connection for advanced console server integration or direct terminal control of the UPS
Energy Star® 2.0 certification with efficiency in online (95%) and Active ECO (98%) modes
SNMP network communications with optional Liebert® RDU101 NIC and free Vertiv™ Power Insight
Gravity-sensing, color LCD for easy configuration and system diagnosis
Scalable power with auto-detection of external battery cabinets
Compatibility: CyberPower Systems Smart App Sinewave UPS Systems
CyberPower Systems Smart App Intelligent LCD/AVR UPS Systems* (CPS1500AVR UPS system is NOT supported)
CyberPower Systems Automatic Transfer Switch (ATS) Power Distribution Units (PDU)
Please see RMCARD Compatibility Chart in the Resources section for details
Note: *UPS systems manufactured in or before 2010 may have a ribbon cable coming out of the RMCARD port and are not compatible with the RMCARD205.
Specifications: System Requirements:
An Ethernet network connection
Web Browser
Network Management System (NMS) compliant with SNMPv1/v3 (optional)
Features: 48V / 70A Output
Fast Charge Technology with Built in Battery Charger
Expandable up to 10 battery modules
2U Rack/Tower Convertible Form Factor
With Hot-Swappable Batteries
Features: Flexible Scheduling
5x8 Startup supports a customer's schedule and business requirements
Certified Representatives
A CyberPower Systems service representative with the training and experience will come to you location to inspect the installion, verify setup, power on, and verify a UPS is operating as designed.
System and Site Review
A technician will inspect the system for handling damage, proper installation, ensure the site meets operational and environmental requirements, and is accessible for future maintenance and service requirements.
Installation Safety Check
An inspection will be done to confirm the circuit breakers are properly sized, and verify wiring to and from breakers is correct. The incoming voltages will be measured to ensure they match system specifications and phasing, and phase...
Features: Flexible Scheduling
Standard unplanned service comes with 5x8 scheduling to meet customer schedule and business requirements. Scheduling outside normal business hours will be quoted seperately.
Certified Representatives
CyberPower Systems service personel have the training and skill to inspect, verify setup, power on, and verify a UPS is operating as designed.
System Repair
A technician will diagnose and make necessary repairs.
System Shut Down/Start Up
A technican will assist with shutting the UPS off and bring it back on to allow for facility maintenance or upgrades.
Labor and Travel Expense Included
The unplanned service visit includes 2 hours of labor and travel expenses to reduce budgeting surprises. Unplanned service visits that occur after hours or that require more than 2 hours will b...