Skip to main content
  • $684.99
  • Free 30-day Returns
  • Ships from United States.

    TESmart 8K@60Hz HDMI KVM Switch 1 Monitor 4 Computers USB 3.0, KVM Switch 4 Port 4K@144Hz for Gaming, Custom Hotkey Switch,ADI Chip and All Input Cables, EDID, Audio&Microphone

    • Item #: 9SIVSBFKSW6606
    • Mfr. Part #: CHIYB0FYF7BXWC
    • UNSPSC: 43222612
    • True 8K@60Hz from ADI Chip, Stable Built-in EDID Emulator, Improved Monitor Compatibility, Zero Flicker, Flash, or Black Screens
    • ADI Chip Solution for Stable and Efficient Performance: Unlike most market solutions that rely solely on traditional physical hard-switching, the TESmart+ADI solution equips each port with a complete signal processing module, including HDCP and EDID emulation. This ensures fast and stable signal switching. This solution ensures signal quality and stability after long cable connections through EQ equalization adjustment. In contrast, traditional hard-switching solutions lack these features, leading to signal loss and quality degradation
    • Resolutions up to 8K (4320p)@60Hz: It is backward compatible with 4K (2160p)@60Hz/120Hz/144Hz. DSC technology allows the transmission of 7680x4320@60Hz 4:4:4 and 3840x2160@144Hz resolutions
    • For your convenience, we have built-in a custom hotkey function. By setting, you can use any key on the keyboard connected to the KVM a
    +
    +
    Overview
    Specs
    Reviews
    True 8K@60Hz from ADI Chip, Stable Built-in EDID Emulator, Improved Monitor Compatibility, Zero Flicker, Flash, or Black Screens
    ADI Chip Solution for Stable and Efficient Performance: Unlike most market solutions that rely solely on traditional physical hard-switching, the TESmart+ADI solution equips each port with a complete signal processing module, including HDCP and EDID emulation. This ensures fast and stable signal switching. This solution ensures signal quality and stability after long cable connections through EQ equalization adjustment. In contrast, traditional hard-switching solutions lack these features, leading to signal loss and quality degradation
    Resolutions up to 8K (4320p)@60Hz: It is backward compatible with 4K (2160p)@60Hz/120Hz/144Hz. DSC technology allows the transmission of 7680x4320@60Hz 4:4:4 and 3840x2160@144Hz resolutions
    For your convenience, we have built-in a custom hotkey function. By setting, you can use any key on the keyboard connected to the KVM as the trigger key for the hot key command
    Ideal KVM for Gaming: Supports Dynamic HDR, including HDMI Dynamic HDR metadata, HDR10+, and Dolby Vision, providing higher dynamic range and color accuracy for more realistic display effects. It also supports Variable Refresh Rate (VRR), Fast Vactive (FVA), and Auto Low Latency Mode (ALLM), reducing screen tearing, stuttering, and input lag for a smoother experience
    Switching Made Easy: Our KVM offers 4 convenient switching options to suit your needs: keyboard hotkeys (customizable), front panel button, mouse wheel, and IR remote (AAA batteries not included). Effortlessly switch between sources and manage your devices with ease
    Integrated Microphone and L/R audio Output: You can listen to audio from one computer while working on the other or scan a document and save in another computer. Only need to press the front panel keys to operate audio, your headphones will stay 'active' during the switch and no longer have to stop and restart meetings

    Warranty & Returns

    Warranty, Returns, And Additional Information

    Warranty

    • Please contact the Seller directly for warranty information. Warranty information may also be found on the Manufacturer's website.
    • CONTACT

    Return Policies

    Manufacturer Contact Info

    LOADING...